HOW TO USE THIS TOOL
Generator Sizing: what the result means
Use to organize appliance nameplate loads before selecting equipment.
Steps
- Total appliances expected to run together.
- Enter the largest additional motor-starting surge.
- Add a planning reserve.
- Verify continuous and surge ratings with manufacturers.
Formula
Planning watts = simultaneous running watts + largest additional startup surge.
Important limits
- Altitude, temperature, fuel and power quality can reduce usable output.
- Follow generator, transfer-switch and appliance documentation.
