HOW TO USE THIS TOOL
Battery Runtime: what the result means
Use for rough off-grid planning with a steady average load.
Steps
- Enter bank amp-hours and nominal voltage.
- Set usable capacity for the battery chemistry and policy.
- Enter inverter efficiency and average load.
- Review estimated watt-hours and runtime.
Formula
Runtime hours = amp-hours × volts × usable fraction × inverter efficiency ÷ load watts.
Important limits
- Real loads cycle and battery performance changes with temperature, age and discharge rate.
- Confirm limits with the battery and inverter manufacturers.
